The plant is connected to the national electricity system through a synchronous 500kV grid, the average electricity output of about 7.2 billion kWh / year, mainly serving the southern load.
Vinh Tan 4 Thermal Power Plant was started in March 2014. This is a project invested by EVN.
Time and place |
Binh Thuan, Vietnam (2016) |
Sectors |
Thermal power plant |
Customer |
Power Engineering Consulting Joint Stock Company 2 (PECC2) |
Scope of supply |
12kV MCSG,H-MCC, RP, LV, DB, TR, M-TR, Busduct, Indoor Accessories, Testing & Installation. |