The plant was built with the financial and technological support of the Soviet Union since 1984, generating unit 1 on 30/4/1988 and inaugurated in 1991.
The hydroelectric plant is built with a total installed capacity of 4 units × 100 MW = 400 MW, annual electricity output of 1.76 billion kWh. This is the EVN owner project.
Time and place |
Dong Nai, Vietnam (2003) |
Sectors | Hydropower Plant |
Customer |
EVNHPC TRI AN |
Scope of supply |
CP-RP, DB, Indoor Accessories |